Tuesday, April 20, 2010

MY JOB EXPERIENCES DETAIL

1. Danone Dairy Indonesia, as Senior Project Engineer, (May 2004 – February 2010)
a. Design extension line process for 2 lines processing and mixing, CIP station. It is erected and conducted in December 2005 and finish in January 2006
b. Design blow molding new extension line for two lines for capacity 1.000.000 bottles a day, include its utilities for chiller, compressor, and material auto loading
c. Design new factory include for process and mixing, utilities include chiller, compressor, clean water, water treatment plant, boiler and steam operation system, cooling storage for Bangladesh plant
d. Design and constructing new line for pouch packaging 2.5 TON/HOUR include PID design, Bill of Material, supervisory mechanical, piping and automation exclude civil. (IDR 2.0 BIO)
e. Design and constructing Fresh milk reception plant 41 TON capacity include PID design, Bill of Material, supervisory mechanical, piping and automation include civil (IDR 582 MIO)
f. Design and constructing Fresh milk incoming preheating capacity 10 TON/HOUR include PID design, Bill of Material, supervisory mechanical, piping and automation (IDR 180 MIO)
g. Design and constructing Choco pre cooling capacity 2.5 TON/HOUR include PID design, Bill of Material, supervisory mechanical, piping (IDR 210 MIO)
h. Redesign and constructing Choco plant capacity include PID design, Bill of Material, supervisory mechanical, piping (IDR 82 MIO)
i. Redesign product design for bottle 80 ML neck ring less and mold single cavity (IDR 432 MIO)
j. Supervisory AHU for 3rd Pouch machine (IDR 225 MIO).
k. Design and CAPEX preparation for Establishment Surabaya Plant (all factory facilities i.e boiler, compressor, cooling tower, chiller, building, land, LNG), this plant need to prepare budget about IDR 52.5 BIO
l. Design and CAPEX preparation for Establishment New Blow Molding Plant, this plant need to prepare budget about IDR 38 BIO
m. Design and CAPEX preparation for Establishment Mixture of last above 2 points, this plant need to prepare budget about IDR 22.5 BIO
n. Improvement of CIP system in Danone Dairy Indonesia to meet Danone Group Quality Chapter and AIB standart.
o. Design and CAPEX preparation for Establishment Mixture for Powder Filling Plant Extention in Danone Dairy Indonesia or Sari Husada in Jogjakarta this plant need to prepare budget about USD 250.000
p. Design and CAPEX preparation for Establishment Mixture for Pouch Filling Extention in Danone Dairy Indonesia, this plant need to prepare budget about IDR 5.7 BIO and have been installed and running well
q. Design and CAPEX preparation for Establishment Mixture for Prebiotic Dairy in Danone Dairy Indonesia, this plant need to prepare budget about IDR 4 BIO and will be installed in end of this month.
2. Garudafood Gunung Putri, Bogor, Dairy and Beverage Engineering Specialist as part of Manufacturing Services Division & Dairy
y

No comments: